]
IMPROVEMENTS IN LOCOMOTIVE BUILDING.
During 1831-35 the company's shops were located at Hoboken, N.J., and
during the winter of 1832-33, three locomotives were commenced at
these shops (two completed before March, 1833, the other in April),
the valves, cylinders, pistons, etc., coming from England, the boilers
being made under the direction of Robert L. Stevens. It was his
opinion that the "John Bull" was too heavy, and the new boilers were
built smaller and lighter, so that the engines, when completed,
weighed eight instead of ten tons. With these three engines, which
were delivered to the railroad company at South Amboy, the stone
blocks and other material for the permanent track was delivered along
the line of the road.
BALDWIN'S FIRST LOCOMOTIVES.
The importation of the locomotive "John Bull" was destined to have a
far-reaching influence in moulding the types of early American
locomotives.
After the demonstration of November 12, 1831, the engine was taken
from the track and stored in a shed constructed to protect it until
such time as the track should be completed.
Pages:
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103